POND WAS TO SHALLOW, SO WE USED OUR 60' LONGRREACH EXCAVATOR TO DIG IT DEEPER.
SPOILS WHERE PILED NEXT TO THE POND SO THEY CAN DRY. LATER THEY WILL BE SPREAD AROUND THE BACK SIDE OF POND.
POND WAS TO SHALLOW, SO WE USED OUR 60' LONGRREACH EXCAVATOR TO DIG IT DEEPER.
SPOILS WHERE PILED NEXT TO THE POND SO THEY CAN DRY. LATER THEY WILL BE SPREAD AROUND THE BACK SIDE OF POND.